SBA LoanBusiness planningStart planning
Menu

What does it cost to start this electrical crew?

Illustrative case · Small licensed residential electrical service and installation crew: one master/owner plus one journeyman and one van · Texas, United States; local authority, address and service radius not selected

Explore this business · Startup costs

The scoped opening budget is $144,996, with $80,836 capital assets and $50,000 available reserve. It is a new-van, already-licensed two-person operation using modest leased storage, not a property purchase or construction-company launch. Supplier comparisons and declared procurement allowances are separated below; the full installed van and tools are not quoted.

Define what must exist on opening day

The owner already holds a master electrician license, hires an already licensed journeyman and launches residential service and small installation work. Storage assumes about 600 square feet at an illustrative $1,200 monthly gross rent. No town, signed premises lease or local asking-rent comparison is claimed. A home-based storage arrangement could change use approvals, insurance and costs; it should not be treated as free by default.

The vehicle case uses Ford’s published $48,400 2026 cargo-van starting MSRP and $2,095 destination/delivery comparison. The manufacturer fact sheet does not establish the body length, roof, payload, local availability or negotiated price. The case adds 6.2% motor vehicle tax under the stated no-trade-in assumption, plus $500 unquoted title/fee allowance. Texas Comptroller’s FY2026 tax description supports the tax rate, not the dealer fee.

Separate assets, expenses and available cash

Opening sources-and-uses detail · USD, illustrative case
UseAmountBasis and unresolved scope
New cargo van, destination, tax and title allowance$54,151One van; Ford starting MSRP is a comparison, exact configuration/dealer quote pending
Secured van upfit$5,920One partition, two shelf units, one rack and paid installation hours; no installed quotation
Tools, access and PPE$12,000Two individual kits plus shared pulling tools; scoped budget, not a single retail kit
Office/mobile equipment$1,200Two devices/shared printer allowance
Equipment tax allowance$1,577Conservative budget on upfit, tools and office scope; local taxable base needs confirmation
Capital procurement contingency$5,9888.0% of subtotal including budgeted taxes; assumed spent/capitalized
Total capital assets$80,836Straight-line book depreciation; no resale proceeds
Pre-opening expenses$7,760Contractor fee, setup, website/identification, training and financing fee
Opening material stock$4,000Tax-inclusive stock asset; consumed later
Refundable storage deposit$2,400Asset retained for 60 months
Available opening reserve$50,000Cash remaining after all other uses
Total uses$144,996Exact sum; monetary display is rounded half-up

The $5,988 procurement allowance is assumed to be spent and capitalized on opening equipment; it is distinct from the cash reserve. If actual quotes leave it unused, retain that cash and rerun depreciation and uses. Do not count an unspent allowance as both an asset and reserve. Pre-opening expenses reduce retained earnings at opening; deposits and stock remain assets.

Quote the equipment schedule, not a headline kit price

Van upfit allowances · before budgeted equipment tax
ComponentQuantityUnit allowanceSubtotal
Partition1$1,200$1,200
Secured shelving2$1,100$2,200
Rack1$1,000$1,000
Installation labor16 hours$95$1,520

WEATHER GUARD’s upfit guidance supports the need for partitions, organized shelving and secure storage. It supplies no installed price for this selected van. Confirm payload after crew, ladders, wire, stock and shelving; quote compatible mounting, access and installation with the vehicle specification.

Crew tool/access/PPE allowances · before tax
ScopeQuantityUnit allowanceSubtotal
Hand-tool and basic tester set2$600$1,200
Cordless drill/cutting kit and batteries2$1,800$3,600
Dedicated clamp/multimeter and verification kit2$1,400$2,800
Portable access ladder2$450$900
Shared pulling/bending tools1$1,800$1,800
Personal protective equipment kit2$850$1,700

Klein’s 80028 kit page establishes a hand-tool/basic-tester scope. A $429.99 indexed Home Depot comparison was visible when checked, but its crawl is historical and live delivered availability was not confirmed. That retailer comparison is not used as a current quote or as the complete crew budget. Power tools, appropriate test equipment, ladders, pulling tools and selected PPE have their own allowances; do not buy a kit and count its included basic testers again.

Reserve follows the monthly trough

Opening stock is $4,000; later inventory targets the larger of $2,500 and 20 normalized days of current material consumption. Supplier purchases are cash-paid; no trade-credit facility is assumed. The base case collects all service sales and 70.0% of installation sales in the same month, with the remainder next month after modeled credit loss.

The base reserve draw to the lowest balance is $29,170, leaving $20,830 in month 5. A collection test reducing same-month installation receipts to 40.0% lowers that trough to $17,391 without changing EBITDA. Longer travel alone lowers the base cash trough to $7,721. Both are separate single-driver tests; they are not the full downside scenario.

Three commitments deserve written evidence

The new vehicle is the largest capital commitment. Obtain an exact dealer configuration, total delivered price, tax/title schedule and payload calculation before finance. The tool schedule is the next major operating purchase: match testing and access to accepted job types and check what the owner already owns. Finally, confirm upfit compatibility and installed cost; removing shelving or partition costs on paper does not establish a usable work vehicle.

For monthly spending, payroll is more consequential than storage rent. The owner and journeyman cost $13,782 per month including the burden allowance before overhead. The $300 GL premium is an assumption; TDLR’s required liability limits describe coverage, not price. A bindable quote must match the crew, work classes, vehicles and customer contracts.

What changes the budget before launch?

Major utility/service upgrades, a shop conversion, additional vehicles, lifts or specialist equipment are excluded. Job material and permit allowances need real bills of material and AHJ quotes; unpriced scope must be added, not entered as zero. The cash-paid financing fee is a general case allowance, not an asserted SBA guaranty fee.

The case uses lump-sum residential real-property repair/installation contracts with supplier tax already in job-material costs. Texas distinguishes residential lump-sum, separated and nonresidential repair contracts. A separate retail sale or different job classification needs a new tax treatment. Before buying, reconcile every quote’s freight, taxes, installation, compatibility, overlapping kit contents and payment date. A revised quote must feed the monthly model and all five guides.

Validate the case inputs

Download the input and evidence register (CSV). This case export separates observed context from assumptions and leaves quotation fields blank for your project. It is an educational register, separate from the planned personalized model.

Sources and scope

Related resources

App coming soon

Start with your business.

Prepare a planning brief for your project.

The personalized plan generator is being built. You can prepare the information it will need:

  1. Your business format, location and opening scope.
  2. Supplier quotes, operating assumptions and owner contribution.
  3. Your funding goal and any instructions from your lender.
Open the preparation checklist

No order is placed and no payment is taken here.