Operating decisions by business
Worked articles that connect practical operating choices to capacity, costs and cash. Each uses a specific educational case and identifies assumptions that still need local evidence.
Counter-service restaurant
- Delivery platforms or direct pickup: compare contribution per order
Compare delivery and direct pickup on the same menu receipt, including ingredients, packaging, commission, payment costs and displaced peak orders.
- How to design a counter-service menu that fits kitchen capacity
Use a station-time worksheet to fit a counter-service menu to peak kitchen capacity, paid shifts, holding space and pickup demand.
Electrical contractor
- How to price electrical jobs when travel and materials vary
Build electrical job estimates that recover paid travel, scoped materials, permits, callbacks and collection costs without confusing markup with margin.
- Service calls or installation projects: choosing an electrical work mix
Compare electrical service calls and small installation projects using paid crew hours, contribution, material cash, scheduling and collection timing.
Commercial cleaning company
- Building a cleaning route: account density, travel and staffing
Evaluate route density from paid travel, access windows and real shifts, with a worked comparison showing how dispersed offices consume capacity.
- How to bid an office-cleaning contract from measured labor hours
Build an office-cleaning bid from a task log, paid delivery time and an allocated roster cost, then test the result against invoice cash.
Pet grooming salon
- Appointment scheduling for a pet groomer: coat type, drying and no-shows
Build a grooming appointment book from active service time, attended drying, safe waiting space and unrecovered cancellations.
- Mobile grooming or a fixed salon: what changes in the operating model
Compare a grooming van with a leased salon by labor, travel, water, power, downtime, paid owner work and funding scope.
Self-service laundromat
- Choosing a washer-size mix: cycles, customer demand and installed costs
Compare laundromat washer sizes using observed load demand, paid cycles, drying, utility scope and incremental installed cost—not vend price alone.
- How to inspect laundromat utilities before signing a lease
Turn a laundromat machine schedule into a utility inspection file: water, sewer, gas, electrical service, exhaust, quotes and lease conditions.
Painting contractor
- Estimating repaint jobs: surface preparation, materials and crew time
Build a repaint estimate from measured surfaces, explicit preparation and person-hours, then check materials, callbacks and collection timing.
- Interior or exterior painting: seasonality and scheduling tradeoffs
Compare interior and exterior repaint schedules through coating windows, occupied-room constraints, paid crew capacity and collection cash.
Roofing contractor
- How supplier deposits and weather affect a roofing project's cash
Follow a roof order from lawful customer advance to supplier payment, weather delay, completed work and cash collection.
- Replacement roofs or repair calls: choosing a roofing work mix
Compare replacement and repair contribution against distinct crew, technician, owner and cash constraints rather than ticket price alone.
Employee-operated nail salon
- Employee pay or booth rental: two different nail-salon economics
Compare a nail salon that earns service receipts with a space-rental business, including paid owner work, vacancies and worker-status evidence.
- How nail service duration changes appointment capacity
Measure full nail-service blocks, compare contribution per booked hour and test the cash impact of slower treatments before adding stations.
Food truck
- Food-truck menu design: prep capacity, service speed and food waste
Design a menu around shared ingredients, paid preparation, the service bottleneck and measured waste, with a worked two-bowl truck example.
- How to evaluate a food-truck service location before booking
Screen a food-truck site for legal access, usable demand, whole-window costs and service capacity before committing to recurring bookings.
Retail bakery
- How to measure bakery waste by product batch
Reconcile bakery production, full-price and discounted sales, donations and discards by batch, then separate waste cost from lost revenue.
- A bakery production schedule: oven time, labor and peak demand
Build a bakery production schedule that connects mixing, proofing, paid labor and oven waves to the retail opening peak.
Local freight trucking company
- Leasing or buying a local delivery truck: comparing cash commitments
Compare cash at signing, fixed payments, maintenance responsibility and terminal value for one hypothetical local delivery truck.
- Pricing local freight when loading time is the bottleneck
Measure dock time, whole-drop capacity and collectible detention before setting a local freight price.
Independent insurance agency
- Building an insurance renewal book: retention and commission timing
Build an insurance renewal forecast from surviving policy cohorts, contract rights, cancellations and carrier settlements rather than premium volume.
- Producer compensation and acquisition cost in an insurance agency
Compare producer base pay, net-commission splits, acquisition spending, service time and retained-book compensation with a reconciled insurance-policy example.
General dental practice
- Dental collections and billed production: reconciling the cash gap
Reconcile dental gross production, contractual discounts, realization allowances, receivable cohorts and bank collections with a worked crown-claim example.
- How chair time and treatment mix shape a dental schedule
Build a joint dentist-and-hygiene schedule from completed treatment episodes, two-visit crowns, owner handoffs and measured room turnover.
Neighborhood grocery store
- Planning a grocery assortment around inventory turns
Build a grocery range from customer missions, cost-valued inventory, replenishment packs and shelf life rather than an arbitrary SKU count.
- How shrinkage and refrigeration affect grocery department contribution
Separate sold-stock costs, cost-valued shrink, refrigeration electricity and downtime before comparing grocery departments.
Physical therapy clinic
- Managing a physical therapy schedule: cancellations and therapist capacity
Build a physical therapy schedule from paid clinician time, documentation and evaluation mix, then measure cancellations and same-slot waitlist refills.
- Cash-pay or insured visits: modeling collections without a universal rate
Compare payer-specific physical therapy visit economics and service-month collection vintages without confusing billed charges, allowed amounts or cash receipts.
CPA practice
- Balancing recurring accounting work and seasonal tax deadlines
Protect recurring accounting service while accepting seasonal tax jobs using separate preparation, owner-review and collection budgets.
- Fixed fees or hourly billing in a small CPA practice
Compare fixed-fee scope risk with hourly realization using client-month and tax-job examples, paid productive labor and separate collection assumptions.
Bookkeeping service
- How to scope a bookkeeping retainer by workload
Build a retainer from coding, reconciliation, exceptions and owner review; compare the promised scope with usable paid capacity before quoting.
- Client onboarding and cleanup work: protecting bookkeeping capacity
Use a readiness gate and a paid-hour queue to separate client onboarding, historical cleanup and recurring bookkeeping before promising a close date.
General veterinary clinic
- Building a veterinary appointment roster around case complexity
Use a role-time worksheet to fit wellness, illness and extended visits to a paid veterinarian/technician roster, including documentation, turnover and referral buffers.
- In-house diagnostics or referral: comparing a small clinic’s equipment scope
Compare chemistry-only purchase and referral costs with QC, repeats, technician time, contractual commitments and the capacity boundary of a small outpatient clinic.
Catering company
- How event deposits and supplier payments shape catering cash
Follow one catering invoice from booking deposit through ingredient and rental prepayments, event service, cancellation exposure and final collection.
- Designing a catering menu for preparation and delivery capacity
Use a catering menu worksheet to compare person-hours, kitchen reservations, batch yield, carrier positions, transport windows and event staffing steps.
Commercial print shop
- Short runs or longer batches: allocating print setup costs
Compare one approved run with repeated short runs at the same sheet total, tracing setup labor, proofs, occupied hours and staged-order cash exposure.
- Outsource finishing or bring it in-house: comparing workload and cash
Test an in-house folding purchase against real job scope, a paid finishing block, incremental monthly cash, loan payments and available production hours.
Coffee shop
- How to test a coffee-shop lease before committing
Test a coffee-shop lease through site feasibility, customer-window evidence, full lease charges and opening-delay cash before accepting the obligation.
- Planning a coffee-shop menu around morning service capacity
Fit a coffee-shop menu to morning arrivals, barista work, pickup flow, batch yield and paid cover with a checked 15-minute operating worksheet.
Self-service car wash
- How wash-bay downtime changes the operating schedule
Choose self-service wash maintenance windows by affected bays and hourly demand, with a worked schedule showing lost sessions, contribution and reopening checks.
- Inspecting an existing self-service wash: drainage, utilities and equipment
Inspect an existing self-service wash before a retrofit: trace drainage, test simultaneous utility demand, check equipment compatibility and document retained assets.
Full-service restaurant
- How to build a restaurant shift roster by meal period
Build a paid restaurant roster from lunch and dinner demand, prep, cleanup and relief; reconcile weekly hours, owner work and overtime.
- Restaurant supplier payments and the opening cash calendar
Map restaurant orders, deliveries, invoice due dates and card transfers to an opening cash calendar; test stock purchases, payroll and credit timing.
Residential remodeling contractor
- Deposits, progress payments and change orders in remodeling
Build remodeling payment milestones, credit deposits, test delayed receipts and price signed changes, using a California example with clear cash boundaries.
- How to estimate a remodeling crew's billable time
Estimate remodeling labor from paid people, approved tasks and actual logs; distinguish billable hours from clock time, fixed-price scope and collected cash.
Neighborhood gym
- Choosing gym space around peak-hour equipment use
Test peak gym visits, equipment queues and operating clearances before comparing premises; use worked station-load and usable-area examples.
- Membership cohorts: tracking gym sign-ups, retention and cancellations
Build equal-age gym membership cohorts, separate cancellation requests from exits, and reconcile retained members with dues and acquisition spend.
HVAC service and installation
- Dispatch, travel and seasonal workload for a small HVAC team
Build a feasible HVAC weekly roster from crew time, travel, callbacks and seasonal demand, with a checked territory and overtime comparison.
- Service agreements or installation work: choosing an HVAC job mix
Compare HVAC agreements, repairs and installations by committed technician time, seasonal obligations and cash timing using a separate worked example.
Residential landscaping service
- Recurring maintenance or seasonal projects: organizing a landscaping calendar
Protect recurring lawn routes, book complete seasonal project blocks and test weather, contribution and payment timing with a Minnesota calendar example.
- Route density and travel time in residential lawn maintenance
Measure the full lawn-maintenance route, compare whole daily stops and test a remote bid against crew time, contribution and weather recovery.
Child care center
- California preschool room capacity: space, staff and enrollment
Test California preschool room capacity with usable activity space, separate group assignments, qualified coverage by interval and truthful enrollment limits.
- Preschool opening schedule: licensing evidence, hiring and enrollment
Build a California preschool opening schedule from licensing evidence, qualified hiring and reviewed family starts, with a separate delay-cost comparison.
General auto repair shop
- How to measure billed technician hours and bay occupancy
Separate paid time, active repair work, sold labor and bay occupation; reconcile invoice cutoffs and identify the next constraint in a three-bay auto shop.
- Parts procurement, returns and warranty rework in an auto shop
Compare suitable parts by landed cost and delivery risk, track cores and supplier credits, and distinguish warranty rework resources from added payroll costs.
Hair salon
- Designing a salon appointment roster by service duration
Build a salon roster from active stylist time, processing intervals and chair or basin reservations; test a worked weekly book and one overlapping appointment.
- Repeat bookings, no-shows and product usage in a small salon
Separate checkout rebooking from completed returns, calculate the contribution of refilled salon slots, and audit product waste without counting its cost twice.